136 Kitchener Road - Waiuku - Auckland | info@lscivil.co.nz
Remove existing bridge crossing over waterway. Cut a new walk way into hillside and install a timber pile retaining wall 2.4m high. Install a new walkway path.
Supply & install ElcoRock 2.5m3 sandbags to construct 3 x groynes (85m) pre and post surveys, Beach replenishment of 3000m3 of sand, Sand extracted from barrow pit, transported and placed over & in between groynes to create a new beach reserve.
Supply & install ElcoRock 2.5m3 sandbags to construct 3 x groynes (85m) pre and post surveys, Beach replenishment of 3000m3 of sand, Sand extracted from barrow pit, transported and placed over & in between groynes to create a new beach reserve.